Gao, K., Wang, L., Luo, J., Jiang, H., Sadollah, A., & Pan, Q. (2018). Discrete harmony search algorithm for scheduling and rescheduling the reprocessing problems in remanufacturing: A case study. Engineering Optimization, 50(6), 965. https://doi.org/10.1080/0305215X.2017.1391240
Chicago Style (17th ed.) CitationGao, Kaizhou, Ling Wang, Jianping Luo, Hua Jiang, Ali Sadollah, and Quanke Pan. "Discrete Harmony Search Algorithm for Scheduling and Rescheduling the Reprocessing Problems in Remanufacturing: A Case Study." Engineering Optimization 50, no. 6 (2018): 965. https://doi.org/10.1080/0305215X.2017.1391240.
MLA (9th ed.) CitationGao, Kaizhou, et al. "Discrete Harmony Search Algorithm for Scheduling and Rescheduling the Reprocessing Problems in Remanufacturing: A Case Study." Engineering Optimization, vol. 50, no. 6, 2018, p. 965, https://doi.org/10.1080/0305215X.2017.1391240.