APA (7th ed.) Citation

Gao, K., Wang, L., Luo, J., Jiang, H., Sadollah, A., & Pan, Q. (2018). Discrete harmony search algorithm for scheduling and rescheduling the reprocessing problems in remanufacturing: A case study. Engineering Optimization, 50(6), 965. https://doi.org/10.1080/0305215X.2017.1391240

Chicago Style (17th ed.) Citation

Gao, Kaizhou, Ling Wang, Jianping Luo, Hua Jiang, Ali Sadollah, and Quanke Pan. "Discrete Harmony Search Algorithm for Scheduling and Rescheduling the Reprocessing Problems in Remanufacturing: A Case Study." Engineering Optimization 50, no. 6 (2018): 965. https://doi.org/10.1080/0305215X.2017.1391240.

MLA (9th ed.) Citation

Gao, Kaizhou, et al. "Discrete Harmony Search Algorithm for Scheduling and Rescheduling the Reprocessing Problems in Remanufacturing: A Case Study." Engineering Optimization, vol. 50, no. 6, 2018, p. 965, https://doi.org/10.1080/0305215X.2017.1391240.

Warning: These citations may not always be 100% accurate.