APA (7th ed.) Citation

Wang, Z., Li, Y., Wu, F., Wu, J., Shi, L., & Lin, K. (2024). Multi-objective day-ahead scheduling of cascade hydropower-photovoltaic complementary system with pumping installation. Energy, 290, N.PAG. https://doi.org/10.1016/j.energy.2024.130258

Chicago Style (17th ed.) Citation

Wang, Zizhao, Yang Li, Feng Wu, Jiawei Wu, Linjun Shi, and Keman Lin. "Multi-objective Day-ahead Scheduling of Cascade Hydropower-photovoltaic Complementary System with Pumping Installation." Energy 290 (2024): N.PAG. https://doi.org/10.1016/j.energy.2024.130258.

MLA (9th ed.) Citation

Wang, Zizhao, et al. "Multi-objective Day-ahead Scheduling of Cascade Hydropower-photovoltaic Complementary System with Pumping Installation." Energy, vol. 290, 2024, p. N.PAG, https://doi.org/10.1016/j.energy.2024.130258.

Warning: These citations may not always be 100% accurate.