APA (7th ed.) Citation

Rodríguez, R., Bascompta, M., & García, H. (2024). Carbon Footprint Evaluation in Tunnels Excavated in Rock Using Tunnel Boring Machine (TBM). International Journal of Civil Engineering, 22(6), 995. https://doi.org/10.1007/s40999-023-00935-0

Chicago Style (17th ed.) Citation

Rodríguez, Rafael, Marc Bascompta, and Héctor García. "Carbon Footprint Evaluation in Tunnels Excavated in Rock Using Tunnel Boring Machine (TBM)." International Journal of Civil Engineering 22, no. 6 (2024): 995. https://doi.org/10.1007/s40999-023-00935-0.

MLA (9th ed.) Citation

Rodríguez, Rafael, et al. "Carbon Footprint Evaluation in Tunnels Excavated in Rock Using Tunnel Boring Machine (TBM)." International Journal of Civil Engineering, vol. 22, no. 6, 2024, p. 995, https://doi.org/10.1007/s40999-023-00935-0.

Warning: These citations may not always be 100% accurate.