Wang, X., Zhang, M., Wu, S., Lin, Y., Song, P., Fan, W., . . . Zheng, X. (2024). Novel Application of a Swift-Assembled Support Method with Prefabricated Corrugated Steel for Vertical Shaft Excavation in a Metro Station. Buildings (2075-5309), 14(11), 3487. https://doi.org/10.3390/buildings14113487
Chicago Style (17th ed.) CitationWang, Xingkuo, Maohui Zhang, Shiqian Wu, Yanjun Lin, Peng Song, Wei Fan, Huanwei Wei, and Xiao Zheng. "Novel Application of a Swift-Assembled Support Method with Prefabricated Corrugated Steel for Vertical Shaft Excavation in a Metro Station." Buildings (2075-5309) 14, no. 11 (2024): 3487. https://doi.org/10.3390/buildings14113487.
MLA (9th ed.) CitationWang, Xingkuo, et al. "Novel Application of a Swift-Assembled Support Method with Prefabricated Corrugated Steel for Vertical Shaft Excavation in a Metro Station." Buildings (2075-5309), vol. 14, no. 11, 2024, p. 3487, https://doi.org/10.3390/buildings14113487.