Takleef, F., Ayadi, O., & Masmoudi, F. (2025). An Integrated Optimization Method for Resource-Constrained Schedule Compression Under Uncertainty in Construction Projects. Applied Sciences (2076-3417), 15(8), 4089. https://doi.org/10.3390/app15084089
Chicago Style (17th ed.) CitationTakleef, Firas, Omar Ayadi, and Faouzi Masmoudi. "An Integrated Optimization Method for Resource-Constrained Schedule Compression Under Uncertainty in Construction Projects." Applied Sciences (2076-3417) 15, no. 8 (2025): 4089. https://doi.org/10.3390/app15084089.
MLA (9th ed.) CitationTakleef, Firas, et al. "An Integrated Optimization Method for Resource-Constrained Schedule Compression Under Uncertainty in Construction Projects." Applied Sciences (2076-3417), vol. 15, no. 8, 2025, p. 4089, https://doi.org/10.3390/app15084089.