KRYSTEK, J., & GEPPERT, A. (2025). A novel heuristic method for flexible job-shop scheduling problem with sequence-dependent setup time, transportation time and machine efficiency constraints. Archives of Control Sciences, 35(3), 485. https://doi.org/10.24425/acs.2025.156308
Chicago Style (17th ed.) CitationKRYSTEK, Jolanta, and Adam GEPPERT. "A Novel Heuristic Method for Flexible Job-shop Scheduling Problem with Sequence-dependent Setup Time, Transportation Time and Machine Efficiency Constraints." Archives of Control Sciences 35, no. 3 (2025): 485. https://doi.org/10.24425/acs.2025.156308.
MLA (9th ed.) CitationKRYSTEK, Jolanta, and Adam GEPPERT. "A Novel Heuristic Method for Flexible Job-shop Scheduling Problem with Sequence-dependent Setup Time, Transportation Time and Machine Efficiency Constraints." Archives of Control Sciences, vol. 35, no. 3, 2025, p. 485, https://doi.org/10.24425/acs.2025.156308.