Li, X., & Qian, X. (2025). Scheduling single-arm multi-cluster tools connected by one-space buffer modules beyond the schedulability assumption. Flexible Services & Manufacturing Journal, 37(4), 1408. https://doi.org/10.1007/s10696-024-09565-7
Chicago Style (17th ed.) CitationLi, Xin, and Xiaohu Qian. "Scheduling Single-arm Multi-cluster Tools Connected by One-space Buffer Modules Beyond the Schedulability Assumption." Flexible Services & Manufacturing Journal 37, no. 4 (2025): 1408. https://doi.org/10.1007/s10696-024-09565-7.
MLA (9th ed.) CitationLi, Xin, and Xiaohu Qian. "Scheduling Single-arm Multi-cluster Tools Connected by One-space Buffer Modules Beyond the Schedulability Assumption." Flexible Services & Manufacturing Journal, vol. 37, no. 4, 2025, p. 1408, https://doi.org/10.1007/s10696-024-09565-7.