Scheduling single-arm multi-cluster tools connected by one-space buffer modules beyond the schedulability assumption.

Saved in:
Bibliographic Details
Title: Scheduling single-arm multi-cluster tools connected by one-space buffer modules beyond the schedulability assumption.
Authors: Li, Xin1, Qian, Xiaohu2, xiaohuqian@live.cn
Source: Flexible Services & Manufacturing Journal; Dec2025, Vol. 37 Issue 4, p1408-1432, 25p
Database: Applied Science & Technology Source
Full text is not displayed to guests.
Description
ISSN:19366582
DOI:10.1007/s10696-024-09565-7