Jin, R., Tong, W., Xu, Y., & Dong, J. (2026). Two-stage flexible flow shop scheduling in GPU systems. Journal of the Operational Research Society, 77(3), 793. https://doi.org/10.1080/01605682.2025.2504435
Chicago Style (17th ed.) CitationJin, Ruyan, Weitian Tong, Yao Xu, and Jianming Dong. "Two-stage Flexible Flow Shop Scheduling in GPU Systems." Journal of the Operational Research Society 77, no. 3 (2026): 793. https://doi.org/10.1080/01605682.2025.2504435.
MLA (9th ed.) CitationJin, Ruyan, et al. "Two-stage Flexible Flow Shop Scheduling in GPU Systems." Journal of the Operational Research Society, vol. 77, no. 3, 2026, p. 793, https://doi.org/10.1080/01605682.2025.2504435.
Warning: These citations may not always be 100% accurate.