Research on Contractor Selection for Grey Plaster Decoration Engineering of Cultural Relic Buildings Based on the BWM-TODIM Method.
Saved in:
| Title: | Research on Contractor Selection for Grey Plaster Decoration Engineering of Cultural Relic Buildings Based on the BWM-TODIM Method. |
|---|---|
| Authors: | Qiao, Yu1, Gao, Le1,2, le.gao@nscc-gz.cn, Deng, Xinwen1,3, Huang, Xiaoying3,4, Wang, Jianqiang4,5, Yang, Tian1,5, Chen, Hengyi1,2 |
| Source: | Buildings (2075-5309); Mar2026, Vol. 16 Issue 6, p1241, 27p |
| Database: | Applied Science & Technology Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| FullText | Links: – Type: pdflink Text: Availability: 1 |
|---|---|
| Header | DbId: aci DbLabel: Applied Science & Technology Source An: 192637377 AccessLevel: 2 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Research on Contractor Selection for Grey Plaster Decoration Engineering of Cultural Relic Buildings Based on the BWM-TODIM Method. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AU" term="%22Qiao%2C+Yu%22">Qiao, Yu</searchLink><relatesTo>1</relatesTo><br /><searchLink fieldCode="AU" term="%22Gao%2C+Le%22">Gao, Le</searchLink><relatesTo>1,2</relatesTo>, <i>le.gao@nscc-gz.cn</i><br /><searchLink fieldCode="AU" term="%22Deng%2C+Xinwen%22">Deng, Xinwen</searchLink><relatesTo>1,3</relatesTo><br /><searchLink fieldCode="AU" term="%22Huang%2C+Xiaoying%22">Huang, Xiaoying</searchLink><relatesTo>3,4</relatesTo><br /><searchLink fieldCode="AU" term="%22Wang%2C+Jianqiang%22">Wang, Jianqiang</searchLink><relatesTo>4,5</relatesTo><br /><searchLink fieldCode="AU" term="%22Yang%2C+Tian%22">Yang, Tian</searchLink><relatesTo>1,5</relatesTo><br /><searchLink fieldCode="AU" term="%22Chen%2C+Hengyi%22">Chen, Hengyi</searchLink><relatesTo>1,2</relatesTo> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Buildings+%282075-5309%29%22">Buildings (2075-5309)</searchLink>; Mar2026, Vol. 16 Issue 6, p1241, 27p |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=aci&AN=192637377 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.3390/buildings16061241 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 27 StartPage: 1241 Titles: – TitleFull: Research on Contractor Selection for Grey Plaster Decoration Engineering of Cultural Relic Buildings Based on the BWM-TODIM Method. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Qiao, Yu – PersonEntity: Name: NameFull: Gao, Le – PersonEntity: Name: NameFull: Deng, Xinwen – PersonEntity: Name: NameFull: Huang, Xiaoying – PersonEntity: Name: NameFull: Wang, Jianqiang – PersonEntity: Name: NameFull: Yang, Tian – PersonEntity: Name: NameFull: Chen, Hengyi IsPartOfRelationships: – BibEntity: Dates: – D: 15 M: 03 Text: Mar2026 Type: published Y: 2026 Identifiers: – Type: issn-print Value: 20755309 Numbering: – Type: volume Value: 16 – Type: issue Value: 6 Titles: – TitleFull: Buildings (2075-5309) Type: main |
| ResultId | 1 |