Pham, V. H. S., Dau, T. D., Huynh, L. G. P., & Lin, C. (2026). Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm. Applied Computational Intelligence & Soft Computing, 2026, 1. https://doi.org/10.1155/acis/9939592
Chicago Style (17th ed.) CitationPham, Vu Hong Son, Thuy Dung Dau, Le Gia Phuc Huynh, and Cheng-Jian Lin. "Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm." Applied Computational Intelligence & Soft Computing 2026 (2026): 1. https://doi.org/10.1155/acis/9939592.
MLA (9th ed.) CitationPham, Vu Hong Son, et al. "Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm." Applied Computational Intelligence & Soft Computing, vol. 2026, 2026, p. 1, https://doi.org/10.1155/acis/9939592.