Calculation Method of Ground Settlement Caused by Mechanical Construction in Metro-Connected Aisle.
Saved in:
| Title: | Calculation Method of Ground Settlement Caused by Mechanical Construction in Metro-Connected Aisle. |
|---|---|
| Authors: | Duan, Yueqiang1, Wang, Maolei1,2, Wang, Jinghe2,3, lzjtuwangjinghe@163.com, Guo, Yuxiang1,2, Chang, Fa2,3, Zhang, Boyuan2,3, Sun, Weiyu2 |
| Source: | Buildings (2075-5309); Apr2026, Vol. 16 Issue 8, p1580, 20p |
| Database: | Applied Science & Technology Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| ISSN: | 20755309 |
|---|---|
| DOI: | 10.3390/buildings16081580 |