Bi-Objective Master Production Scheduling Considering Production Smoothing: A Case Study in the Truck Industry.
Saved in:
| Title: | Bi-Objective Master Production Scheduling Considering Production Smoothing: A Case Study in the Truck Industry. |
|---|---|
| Authors: | Jalilvand, Sana1, Mahmoodjanloo, Mehdi1, Baboli, Armand1, armand.baboli@insa-lyon.fr |
| Source: | Applied Sciences (2076-3417); May2026, Vol. 16 Issue 10, p5005, 31p |
| Database: | Applied Science & Technology Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| ISSN: | 20763417 |
|---|---|
| DOI: | 10.3390/app16105005 |