Al Ahmad, M. H., Arifuddin, R., & Abdurrahman, M. A. (2026). Cost Overrun Factors in Construction Projects: A BIM and SEM Analysis. Engineering, Technology & Applied Science Research, 16(2), 33365. https://doi.org/10.48084/etasr.14744
Chicago Style (17th ed.) CitationAl Ahmad, Muhammad Hijerah, Rosmariani Arifuddin, and M. Asad Abdurrahman. "Cost Overrun Factors in Construction Projects: A BIM and SEM Analysis." Engineering, Technology & Applied Science Research 16, no. 2 (2026): 33365. https://doi.org/10.48084/etasr.14744.
MLA (9th ed.) CitationAl Ahmad, Muhammad Hijerah, et al. "Cost Overrun Factors in Construction Projects: A BIM and SEM Analysis." Engineering, Technology & Applied Science Research, vol. 16, no. 2, 2026, p. 33365, https://doi.org/10.48084/etasr.14744.