Zhang, Y., & Wang, J. (2026). Improved Pulse Discrete Time Model for Resource-Constrained Project Scheduling Problem. Buildings (2075-5309), 16(11), 2276. https://doi.org/10.3390/buildings16112276
Chicago Style (17th ed.) CitationZhang, Yu, and Jia Wang. "Improved Pulse Discrete Time Model for Resource-Constrained Project Scheduling Problem." Buildings (2075-5309) 16, no. 11 (2026): 2276. https://doi.org/10.3390/buildings16112276.
MLA (9th ed.) CitationZhang, Yu, and Jia Wang. "Improved Pulse Discrete Time Model for Resource-Constrained Project Scheduling Problem." Buildings (2075-5309), vol. 16, no. 11, 2026, p. 2276, https://doi.org/10.3390/buildings16112276.
Warning: These citations may not always be 100% accurate.