Chen, Y., Wang, H., Tsai, C., & Wu, C. (2026). A genetic algorithm for tool-constrained scheduling with dynamic expedited orders in smart manufacturing. Journal of Industrial & Management Optimization, 22(1), 1.
Chicago Style (17th ed.) CitationChen, Yi-Han, Hsi-Wen Wang, Chiung-Hui Tsai, and Chih-Hung Wu. "A Genetic Algorithm for Tool-constrained Scheduling with Dynamic Expedited Orders in Smart Manufacturing." Journal of Industrial & Management Optimization 22, no. 1 (2026): 1.
MLA (9th ed.) CitationChen, Yi-Han, et al. "A Genetic Algorithm for Tool-constrained Scheduling with Dynamic Expedited Orders in Smart Manufacturing." Journal of Industrial & Management Optimization, vol. 22, no. 1, 2026, p. 1.
Warning: These citations may not always be 100% accurate.