APA (7th ed.) Citation

Hwang, H., & Choi, J. (2026). An openBIM-Based Integrated Process for Quantity Take-Off and Schematic Cost Estimation to Support Schematic and Preliminary Design Decision Making. Buildings (2075-5309), 16(12), 2307. https://doi.org/10.3390/buildings16122307

Chicago Style (17th ed.) Citation

Hwang, Hyebin, and Jungsik Choi. "An OpenBIM-Based Integrated Process for Quantity Take-Off and Schematic Cost Estimation to Support Schematic and Preliminary Design Decision Making." Buildings (2075-5309) 16, no. 12 (2026): 2307. https://doi.org/10.3390/buildings16122307.

MLA (9th ed.) Citation

Hwang, Hyebin, and Jungsik Choi. "An OpenBIM-Based Integrated Process for Quantity Take-Off and Schematic Cost Estimation to Support Schematic and Preliminary Design Decision Making." Buildings (2075-5309), vol. 16, no. 12, 2026, p. 2307, https://doi.org/10.3390/buildings16122307.

Warning: These citations may not always be 100% accurate.