APA (7th ed.) Citation

Isidore, L. J., & Back, W. E. (2001). Probabilistic optimal-cost scheduling. Journal of Construction Engineering & Management, 127(6), 431. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(431)

Chicago Style (17th ed.) Citation

Isidore, Leroy J., and W. Edward Back. "Probabilistic Optimal-cost Scheduling." Journal of Construction Engineering & Management 127, no. 6 (2001): 431. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(431).

MLA (9th ed.) Citation

Isidore, Leroy J., and W. Edward Back. "Probabilistic Optimal-cost Scheduling." Journal of Construction Engineering & Management, vol. 127, no. 6, 2001, p. 431, https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(431).

Warning: These citations may not always be 100% accurate.