Probabilistic optimal-cost scheduling.
Saved in:
| Title: | Probabilistic optimal-cost scheduling. |
|---|---|
| Authors: | Isidore, Leroy J., Back, W. Edward |
| Source: | Journal of Construction Engineering & Management; November/December 2001, Vol. 127 Issue 6, p431-437, 7p |
| Database: | Applied Science & Technology Source |
| FullText | Links: – Type: pdflink Text: Availability: 0 |
|---|---|
| Header | DbId: aci DbLabel: Applied Science & Technology Source An: 500825672 AccessLevel: 2 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Probabilistic optimal-cost scheduling. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AU" term="%22Isidore%2C+Leroy+J%2E%22">Isidore, Leroy J.</searchLink><br /><searchLink fieldCode="AU" term="%22Back%2C+W%2E+Edward%22">Back, W. Edward</searchLink> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Journal+of+Construction+Engineering+%26+Management%22">Journal of Construction Engineering & Management</searchLink>; November/December 2001, Vol. 127 Issue 6, p431-437, 7p |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=aci&AN=500825672 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.1061/(ASCE)0733-9364(2001)127:6(431) Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 7 StartPage: 431 Titles: – TitleFull: Probabilistic optimal-cost scheduling. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Isidore, Leroy J. – PersonEntity: Name: NameFull: Back, W. Edward IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 11 Text: November/December 2001 Type: published Y: 2001 Identifiers: – Type: issn-print Value: 07339364 Numbering: – Type: volume Value: 127 – Type: issue Value: 6 Titles: – TitleFull: Journal of Construction Engineering & Management Type: main |
| ResultId | 1 |