Isidore, L. J., & Back, W. E. (2002). Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration. Journal of Construction Engineering & Management, 128(3), 211. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:3(211)
Chicago Style (17th ed.) CitationIsidore, Leroy J., and W. Edward Back. "Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration." Journal of Construction Engineering & Management 128, no. 3 (2002): 211. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:3(211).
MLA (9th ed.) CitationIsidore, Leroy J., and W. Edward Back. "Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration." Journal of Construction Engineering & Management, vol. 128, no. 3, 2002, p. 211, https://doi.org/10.1061/(ASCE)0733-9364(2002)128:3(211).