APA (7th ed.) Citation

Kaiser, M. J., Pulsipher, A. G., & Byrd, R. C. (2005). Cost of Abrasive Cutting in Decommissioning Operations in the Gulf of Mexico. Journal of Construction Engineering & Management, 131(1), 137. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(137)

Chicago Style (17th ed.) Citation

Kaiser, Mark J., Allan G. Pulsipher, and Robert C. Byrd. "Cost of Abrasive Cutting in Decommissioning Operations in the Gulf of Mexico." Journal of Construction Engineering & Management 131, no. 1 (2005): 137. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(137).

MLA (9th ed.) Citation

Kaiser, Mark J., et al. "Cost of Abrasive Cutting in Decommissioning Operations in the Gulf of Mexico." Journal of Construction Engineering & Management, vol. 131, no. 1, 2005, p. 137, https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(137).

Warning: These citations may not always be 100% accurate.