Hegazy, T., & Menesi, W. (2012). Closure to 'Critical Path Segments Scheduling Technique' by Tarek Hegazy and Wail Menesi. Journal of Construction Engineering & Management, 138(6), 788. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000541
Chicago Style (17th ed.) CitationHegazy, Tarek, and Wail Menesi. "Closure to 'Critical Path Segments Scheduling Technique' by Tarek Hegazy and Wail Menesi." Journal of Construction Engineering & Management 138, no. 6 (2012): 788. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000541.
MLA (9th ed.) CitationHegazy, Tarek, and Wail Menesi. "Closure to 'Critical Path Segments Scheduling Technique' by Tarek Hegazy and Wail Menesi." Journal of Construction Engineering & Management, vol. 138, no. 6, 2012, p. 788, https://doi.org/10.1061/(ASCE)CO.1943-7862.0000541.