Weshah, N., El-Ghandour, W., Falls, L. C., & Jergeas, G. (2014). Enhancing project performance by developing multiple regression analysis and risk analysis models for interface. Canadian Journal of Civil Engineering, 41(11), 929. https://doi.org/10.1139/cjce-2013-0499
Chicago Style (17th ed.) CitationWeshah, Nesreen, Wael El-Ghandour, Lynne Cowe Falls, and George Jergeas. "Enhancing Project Performance by Developing Multiple Regression Analysis and Risk Analysis Models for Interface." Canadian Journal of Civil Engineering 41, no. 11 (2014): 929. https://doi.org/10.1139/cjce-2013-0499.
MLA (9th ed.) CitationWeshah, Nesreen, et al. "Enhancing Project Performance by Developing Multiple Regression Analysis and Risk Analysis Models for Interface." Canadian Journal of Civil Engineering, vol. 41, no. 11, 2014, p. 929, https://doi.org/10.1139/cjce-2013-0499.