APA (7th ed.) Citation

DUDA, J., FIEREK, S., KARKULA, M., KISIELEWSKI, P., PUKA, R., REDMER, A., & SKALNA, I. (2023). DETERMINING LOWER BOUND ON NUMBER OF VEHICLE BLOCKS IN MULTI-DEPOT VEHICLE SCHEDULING PROBLEM WITH MIXED FLEET COVERING ELECTRIC BUSES. Archives of Transport, 65(1), 27. https://doi.org/10.5604/01.3001.0016.2475

Chicago Style (17th ed.) Citation

DUDA, Jerzy, Szymon FIEREK, Marek KARKULA, Piotr KISIELEWSKI, Radosław PUKA, Adam REDMER, and Iwona SKALNA. "DETERMINING LOWER BOUND ON NUMBER OF VEHICLE BLOCKS IN MULTI-DEPOT VEHICLE SCHEDULING PROBLEM WITH MIXED FLEET COVERING ELECTRIC BUSES." Archives of Transport 65, no. 1 (2023): 27. https://doi.org/10.5604/01.3001.0016.2475.

MLA (9th ed.) Citation

DUDA, Jerzy, et al. "DETERMINING LOWER BOUND ON NUMBER OF VEHICLE BLOCKS IN MULTI-DEPOT VEHICLE SCHEDULING PROBLEM WITH MIXED FLEET COVERING ELECTRIC BUSES." Archives of Transport, vol. 65, no. 1, 2023, p. 27, https://doi.org/10.5604/01.3001.0016.2475.

Warning: These citations may not always be 100% accurate.