APA (7th ed.) Citation

Li, Y., Li, O., Wu, F., Ma, S., Shi, L., & Hong, F. (2023). Multi-Objective Capacity Optimization of Grid-Connected Wind–Pumped Hydro Storage Hybrid Systems Considering Variable-Speed Operation. Energies (19961073), 16(24), 8113. https://doi.org/10.3390/en16248113

Chicago Style (17th ed.) Citation

Li, Yang, Outing Li, Feng Wu, Shiyi Ma, Linjun Shi, and Feilong Hong. "Multi-Objective Capacity Optimization of Grid-Connected Wind–Pumped Hydro Storage Hybrid Systems Considering Variable-Speed Operation." Energies (19961073) 16, no. 24 (2023): 8113. https://doi.org/10.3390/en16248113.

MLA (9th ed.) Citation

Li, Yang, et al. "Multi-Objective Capacity Optimization of Grid-Connected Wind–Pumped Hydro Storage Hybrid Systems Considering Variable-Speed Operation." Energies (19961073), vol. 16, no. 24, 2023, p. 8113, https://doi.org/10.3390/en16248113.

Warning: These citations may not always be 100% accurate.