Multi-Objective Capacity Optimization of Grid-Connected Wind–Pumped Hydro Storage Hybrid Systems Considering Variable-Speed Operation.
Saved in:
| Title: | Multi-Objective Capacity Optimization of Grid-Connected Wind–Pumped Hydro Storage Hybrid Systems Considering Variable-Speed Operation. |
|---|---|
| Authors: | Li, Yang1 (AUTHOR) 211606010133@hhu.edu.cn, Li, Outing1 (AUTHOR) wufeng@hhu.edu.cn, Wu, Feng1 (AUTHOR) 19990041@hhu.edu.cn, Ma, Shiyi2 (AUTHOR) 13810639756@139.com, Shi, Linjun1 (AUTHOR) 221606030017@hhu.edu.cn, Hong, Feilong1 (AUTHOR) |
| Source: | Energies (19961073). Dec2023, Vol. 16 Issue 24, p8113. 17p. |
| Database: | Academic Search Ultimate |
|
Full text is not displayed to guests.
Login for full access.
|
|
| FullText | Links: – Type: pdflink Text: Availability: 1 |
|---|---|
| Header | DbId: asn DbLabel: Academic Search Ultimate An: 174437692 AccessLevel: 2 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Multi-Objective Capacity Optimization of Grid-Connected Wind–Pumped Hydro Storage Hybrid Systems Considering Variable-Speed Operation. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Li%2C+Yang%22">Li, Yang</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> 211606010133@hhu.edu.cn</i><br /><searchLink fieldCode="AR" term="%22Li%2C+Outing%22">Li, Outing</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> wufeng@hhu.edu.cn</i><br /><searchLink fieldCode="AR" term="%22Wu%2C+Feng%22">Wu, Feng</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> 19990041@hhu.edu.cn</i><br /><searchLink fieldCode="AR" term="%22Ma%2C+Shiyi%22">Ma, Shiyi</searchLink><relatesTo>2</relatesTo> (AUTHOR)<i> 13810639756@139.com</i><br /><searchLink fieldCode="AR" term="%22Shi%2C+Linjun%22">Shi, Linjun</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> 221606030017@hhu.edu.cn</i><br /><searchLink fieldCode="AR" term="%22Hong%2C+Feilong%22">Hong, Feilong</searchLink><relatesTo>1</relatesTo> (AUTHOR) – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Energies+%2819961073%29%22">Energies (19961073)</searchLink>. Dec2023, Vol. 16 Issue 24, p8113. 17p. |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=asn&AN=174437692 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.3390/en16248113 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 17 StartPage: 8113 Titles: – TitleFull: Multi-Objective Capacity Optimization of Grid-Connected Wind–Pumped Hydro Storage Hybrid Systems Considering Variable-Speed Operation. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Li, Yang – PersonEntity: Name: NameFull: Li, Outing – PersonEntity: Name: NameFull: Wu, Feng – PersonEntity: Name: NameFull: Ma, Shiyi – PersonEntity: Name: NameFull: Shi, Linjun – PersonEntity: Name: NameFull: Hong, Feilong IsPartOfRelationships: – BibEntity: Dates: – D: 15 M: 12 Text: Dec2023 Type: published Y: 2023 Identifiers: – Type: issn-print Value: 19961073 Numbering: – Type: volume Value: 16 – Type: issue Value: 24 Titles: – TitleFull: Energies (19961073) Type: main |
| ResultId | 1 |