Multi-Objective Capacity Optimization of Grid-Connected Wind–Pumped Hydro Storage Hybrid Systems Considering Variable-Speed Operation.

Saved in:
Bibliographic Details
Title: Multi-Objective Capacity Optimization of Grid-Connected Wind–Pumped Hydro Storage Hybrid Systems Considering Variable-Speed Operation.
Authors: Li, Yang1 (AUTHOR) 211606010133@hhu.edu.cn, Li, Outing1 (AUTHOR) wufeng@hhu.edu.cn, Wu, Feng1 (AUTHOR) 19990041@hhu.edu.cn, Ma, Shiyi2 (AUTHOR) 13810639756@139.com, Shi, Linjun1 (AUTHOR) 221606030017@hhu.edu.cn, Hong, Feilong1 (AUTHOR)
Source: Energies (19961073). Dec2023, Vol. 16 Issue 24, p8113. 17p.
Database: Academic Search Ultimate
Full text is not displayed to guests.
Be the first to leave a comment!
You must be logged in first