Liang, Z., Peng, J., Zhao, C., Zhou, H., Li, D., Zhou, Y., . . . Wang, F. (2025). Modelling and simulation of the block pouring construction system considering spatial–temporal conflict of construction machinery in arch dams. Scientific Reports, 15(1), 1. https://doi.org/10.1038/s41598-025-09998-6
Chicago Style (17th ed.) CitationLiang, Zhipeng, et al. "Modelling and Simulation of the Block Pouring Construction System Considering Spatial–temporal Conflict of Construction Machinery in Arch Dams." Scientific Reports 15, no. 1 (2025): 1. https://doi.org/10.1038/s41598-025-09998-6.
MLA (9th ed.) CitationLiang, Zhipeng, et al. "Modelling and Simulation of the Block Pouring Construction System Considering Spatial–temporal Conflict of Construction Machinery in Arch Dams." Scientific Reports, vol. 15, no. 1, 2025, p. 1, https://doi.org/10.1038/s41598-025-09998-6.