Optimization study of blasting technology for deeply buried drainage trench in tunnel based on SPH-FEM coupled simulation.
Saved in:
| Title: | Optimization study of blasting technology for deeply buried drainage trench in tunnel based on SPH-FEM coupled simulation. |
|---|---|
| Authors: | ZHANG, Hailan1, WU, Yunpeng1, ZOU, Ren1, MA, Xiaolong2, LI, Kuntai3, GAO, Qidong3 qdgao@chd.edu.cn, NIU, Lei4, ZHOU, Haixiao3 |
| Source: | Hazard Control in Tunnelling & Underground Engineering. Sep2025, Vol. 7 Issue 3, p93-104. 12p. |
| Database: | Academic Search Ultimate |
| FullText | Links: – Type: pdflink Text: Availability: 0 |
|---|---|
| Header | DbId: asn DbLabel: Academic Search Ultimate An: 188179289 AccessLevel: 2 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Optimization study of blasting technology for deeply buried drainage trench in tunnel based on SPH-FEM coupled simulation. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22ZHANG%2C+Hailan%22">ZHANG, Hailan</searchLink><relatesTo>1</relatesTo><br /><searchLink fieldCode="AR" term="%22WU%2C+Yunpeng%22">WU, Yunpeng</searchLink><relatesTo>1</relatesTo><br /><searchLink fieldCode="AR" term="%22ZOU%2C+Ren%22">ZOU, Ren</searchLink><relatesTo>1</relatesTo><br /><searchLink fieldCode="AR" term="%22MA%2C+Xiaolong%22">MA, Xiaolong</searchLink><relatesTo>2</relatesTo><br /><searchLink fieldCode="AR" term="%22LI%2C+Kuntai%22">LI, Kuntai</searchLink><relatesTo>3</relatesTo><br /><searchLink fieldCode="AR" term="%22GAO%2C+Qidong%22">GAO, Qidong</searchLink><relatesTo>3</relatesTo><i> qdgao@chd.edu.cn</i><br /><searchLink fieldCode="AR" term="%22NIU%2C+Lei%22">NIU, Lei</searchLink><relatesTo>4</relatesTo><br /><searchLink fieldCode="AR" term="%22ZHOU%2C+Haixiao%22">ZHOU, Haixiao</searchLink><relatesTo>3</relatesTo> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Hazard+Control+in+Tunnelling+%26+Underground+Engineering%22">Hazard Control in Tunnelling & Underground Engineering</searchLink>. Sep2025, Vol. 7 Issue 3, p93-104. 12p. |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=asn&AN=188179289 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.19952/j.cnki.2096-5052.2025.03.08 Languages: – Code: chi Text: Chinese PhysicalDescription: Pagination: PageCount: 12 StartPage: 93 Titles: – TitleFull: Optimization study of blasting technology for deeply buried drainage trench in tunnel based on SPH-FEM coupled simulation. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: ZHANG, Hailan – PersonEntity: Name: NameFull: WU, Yunpeng – PersonEntity: Name: NameFull: ZOU, Ren – PersonEntity: Name: NameFull: MA, Xiaolong – PersonEntity: Name: NameFull: LI, Kuntai – PersonEntity: Name: NameFull: GAO, Qidong – PersonEntity: Name: NameFull: NIU, Lei – PersonEntity: Name: NameFull: ZHOU, Haixiao IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 09 Text: Sep2025 Type: published Y: 2025 Identifiers: – Type: issn-print Value: 20965052 Numbering: – Type: volume Value: 7 – Type: issue Value: 3 Titles: – TitleFull: Hazard Control in Tunnelling & Underground Engineering Type: main |
| ResultId | 1 |