Optimization Analysis of Medium- to Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining.

Saved in:
Bibliographic Details
Title: Optimization Analysis of Medium- to Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining.
Authors: Ren, Zhu-li1,2 (AUTHOR) zhuliren@hpu.edu.cn, Yuan, Rui-fu1,2 (AUTHOR), Wang, Li-guan3 (AUTHOR), Du, Feng1,2 (AUTHOR), Deng, Haokun1,2 (AUTHOR)
Source: Journal of Mining Science. Jun2025, Vol. 61 Issue 3, p429-441. 13p.
Database: Academic Search Ultimate
Full text is not displayed to guests.
FullText Links:
  – Type: pdflink
Text:
  Availability: 1
Header DbId: asn
DbLabel: Academic Search Ultimate
An: 188778006
AccessLevel: 2
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Optimization Analysis of Medium- to Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Ren%2C+Zhu-li%22">Ren, Zhu-li</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)<i> zhuliren@hpu.edu.cn</i><br /><searchLink fieldCode="AR" term="%22Yuan%2C+Rui-fu%22">Yuan, Rui-fu</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Wang%2C+Li-guan%22">Wang, Li-guan</searchLink><relatesTo>3</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Du%2C+Feng%22">Du, Feng</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Deng%2C+Haokun%22">Deng, Haokun</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22Journal+of+Mining+Science%22">Journal of Mining Science</searchLink>. Jun2025, Vol. 61 Issue 3, p429-441. 13p.
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=asn&AN=188778006
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.1134/S106273912503010X
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 13
        StartPage: 429
    Titles:
      – TitleFull: Optimization Analysis of Medium- to Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Ren, Zhu-li
      – PersonEntity:
          Name:
            NameFull: Yuan, Rui-fu
      – PersonEntity:
          Name:
            NameFull: Wang, Li-guan
      – PersonEntity:
          Name:
            NameFull: Du, Feng
      – PersonEntity:
          Name:
            NameFull: Deng, Haokun
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 06
              Text: Jun2025
              Type: published
              Y: 2025
          Identifiers:
            – Type: issn-print
              Value: 10627391
          Numbering:
            – Type: volume
              Value: 61
            – Type: issue
              Value: 3
          Titles:
            – TitleFull: Journal of Mining Science
              Type: main
ResultId 1