Optimization Analysis of Medium- to Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining.
Saved in:
| Title: | Optimization Analysis of Medium- to Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining. |
|---|---|
| Authors: | Ren, Zhu-li1,2 (AUTHOR) zhuliren@hpu.edu.cn, Yuan, Rui-fu1,2 (AUTHOR), Wang, Li-guan3 (AUTHOR), Du, Feng1,2 (AUTHOR), Deng, Haokun1,2 (AUTHOR) |
| Source: | Journal of Mining Science. Jun2025, Vol. 61 Issue 3, p429-441. 13p. |
| Database: | Academic Search Ultimate |
|
Full text is not displayed to guests.
Login for full access.
|
|
| FullText | Links: – Type: pdflink Text: Availability: 1 |
|---|---|
| Header | DbId: asn DbLabel: Academic Search Ultimate An: 188778006 AccessLevel: 2 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Optimization Analysis of Medium- to Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Ren%2C+Zhu-li%22">Ren, Zhu-li</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)<i> zhuliren@hpu.edu.cn</i><br /><searchLink fieldCode="AR" term="%22Yuan%2C+Rui-fu%22">Yuan, Rui-fu</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Wang%2C+Li-guan%22">Wang, Li-guan</searchLink><relatesTo>3</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Du%2C+Feng%22">Du, Feng</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Deng%2C+Haokun%22">Deng, Haokun</searchLink><relatesTo>1,2</relatesTo> (AUTHOR) – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Journal+of+Mining+Science%22">Journal of Mining Science</searchLink>. Jun2025, Vol. 61 Issue 3, p429-441. 13p. |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=asn&AN=188778006 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.1134/S106273912503010X Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 13 StartPage: 429 Titles: – TitleFull: Optimization Analysis of Medium- to Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Ren, Zhu-li – PersonEntity: Name: NameFull: Yuan, Rui-fu – PersonEntity: Name: NameFull: Wang, Li-guan – PersonEntity: Name: NameFull: Du, Feng – PersonEntity: Name: NameFull: Deng, Haokun IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 06 Text: Jun2025 Type: published Y: 2025 Identifiers: – Type: issn-print Value: 10627391 Numbering: – Type: volume Value: 61 – Type: issue Value: 3 Titles: – TitleFull: Journal of Mining Science Type: main |
| ResultId | 1 |