Meng, F., Wang, P., Deng, S., Chen, C., Zhao, Z., & Li, J. (2026). Preparation of Shell-Core Structured Ceramsite from Red Mud and Electrolytic Aluminum Repair Slag to Enhance the Thermal Insulation Performance of Cement Mortar. Arabian Journal for Science & Engineering (Springer Science & Business Media B.V. ), 51(4), 4493. https://doi.org/10.1007/s13369-025-10287-7
Chicago Style (17th ed.) CitationMeng, Fanyu, Peihui Wang, Shilin Deng, Chunheng Chen, Zhenxia Zhao, and Jing Li. "Preparation of Shell-Core Structured Ceramsite from Red Mud and Electrolytic Aluminum Repair Slag to Enhance the Thermal Insulation Performance of Cement Mortar." Arabian Journal for Science & Engineering (Springer Science & Business Media B.V. ) 51, no. 4 (2026): 4493. https://doi.org/10.1007/s13369-025-10287-7.
MLA (9th ed.) CitationMeng, Fanyu, et al. "Preparation of Shell-Core Structured Ceramsite from Red Mud and Electrolytic Aluminum Repair Slag to Enhance the Thermal Insulation Performance of Cement Mortar." Arabian Journal for Science & Engineering (Springer Science & Business Media B.V. ), vol. 51, no. 4, 2026, p. 4493, https://doi.org/10.1007/s13369-025-10287-7.