Manafi, E., Domenech, B., Ranaboldo, M., Bullich-Massagué, E., Juanpera-Gallel, M., & Moreno, R. P. (2026). An energy-aware scheduling problem in a job shop floor with moulding machines: A manufacturing industry case. International Journal of Advanced Manufacturing Technology, 145(1/2), 1343. https://doi.org/10.1007/s00170-026-18390-1
Chicago Style (17th ed.) CitationManafi, Ehsan, Bruno Domenech, Matteo Ranaboldo, Eduard Bullich-Massagué, Marc Juanpera-Gallel, and Rafael Pastor Moreno. "An Energy-aware Scheduling Problem in a Job Shop Floor with Moulding Machines: A Manufacturing Industry Case." International Journal of Advanced Manufacturing Technology 145, no. 1/2 (2026): 1343. https://doi.org/10.1007/s00170-026-18390-1.
MLA (9th ed.) CitationManafi, Ehsan, et al. "An Energy-aware Scheduling Problem in a Job Shop Floor with Moulding Machines: A Manufacturing Industry Case." International Journal of Advanced Manufacturing Technology, vol. 145, no. 1/2, 2026, p. 1343, https://doi.org/10.1007/s00170-026-18390-1.