Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization.

Saved in:
Bibliographic Details
Title: Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization.
Authors: Gao, Kaizhou1 gaokaizh@yahoo.com.cn, Pan, Quanke1, Suganthan, P.2, Li, Junqing1
Source: International Journal of Advanced Manufacturing Technology. Jun2013, Vol. 66 Issue 9-12, p1563-1572. 10p. 8 Charts, 2 Graphs.
Database: Academic Search Ultimate
FullText Links:
  – Type: pdflink
Text:
  Availability: 0
Header DbId: asn
DbLabel: Academic Search Ultimate
An: 87785753
AccessLevel: 2
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Gao%2C+Kaizhou%22">Gao, Kaizhou</searchLink><relatesTo>1</relatesTo><i> gaokaizh@yahoo.com.cn</i><br /><searchLink fieldCode="AR" term="%22Pan%2C+Quanke%22">Pan, Quanke</searchLink><relatesTo>1</relatesTo><br /><searchLink fieldCode="AR" term="%22Suganthan%2C+P%2E%22">Suganthan, P.</searchLink><relatesTo>2</relatesTo><br /><searchLink fieldCode="AR" term="%22Li%2C+Junqing%22">Li, Junqing</searchLink><relatesTo>1</relatesTo>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22International+Journal+of+Advanced+Manufacturing+Technology%22">International Journal of Advanced Manufacturing Technology</searchLink>. Jun2013, Vol. 66 Issue 9-12, p1563-1572. 10p. 8 Charts, 2 Graphs.
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=asn&AN=87785753
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.1007/s00170-012-4440-5
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 10
        StartPage: 1563
    Titles:
      – TitleFull: Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Gao, Kaizhou
      – PersonEntity:
          Name:
            NameFull: Pan, Quanke
      – PersonEntity:
          Name:
            NameFull: Suganthan, P.
      – PersonEntity:
          Name:
            NameFull: Li, Junqing
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 06
              Text: Jun2013
              Type: published
              Y: 2013
          Identifiers:
            – Type: issn-print
              Value: 02683768
          Numbering:
            – Type: volume
              Value: 66
            – Type: issue
              Value: 9-12
          Titles:
            – TitleFull: International Journal of Advanced Manufacturing Technology
              Type: main
ResultId 1