Sun, D., Tang, L., Baldacci, R., & Chen, Z. (2024). A Decomposition Method for the Group-Based Quay Crane Scheduling Problem. INFORMS Journal on Computing, 36(2), 543. https://doi.org/10.1287/ijoc.2022.0298
Chicago Style (17th ed.) CitationSun, Defeng, Lixin Tang, Roberto Baldacci, and Zihan Chen. "A Decomposition Method for the Group-Based Quay Crane Scheduling Problem." INFORMS Journal on Computing 36, no. 2 (2024): 543. https://doi.org/10.1287/ijoc.2022.0298.
MLA (9th ed.) CitationSun, Defeng, et al. "A Decomposition Method for the Group-Based Quay Crane Scheduling Problem." INFORMS Journal on Computing, vol. 36, no. 2, 2024, p. 543, https://doi.org/10.1287/ijoc.2022.0298.
Warning: These citations may not always be 100% accurate.