APA (7th ed.) Citation

Lovato, D., Guillaume, R., Thierry, C., & Battaïa, O. (2025). Aircraft final assembly line scheduling with user preferences and equity of work distribution. Flexible Services & Manufacturing Journal, 37(2), 348. https://doi.org/10.1007/s10696-024-09566-6

Chicago Style (17th ed.) Citation

Lovato, D., R. Guillaume, C. Thierry, and O. Battaïa. "Aircraft Final Assembly Line Scheduling with User Preferences and Equity of Work Distribution." Flexible Services & Manufacturing Journal 37, no. 2 (2025): 348. https://doi.org/10.1007/s10696-024-09566-6.

MLA (9th ed.) Citation

Lovato, D., et al. "Aircraft Final Assembly Line Scheduling with User Preferences and Equity of Work Distribution." Flexible Services & Manufacturing Journal, vol. 37, no. 2, 2025, p. 348, https://doi.org/10.1007/s10696-024-09566-6.

Warning: These citations may not always be 100% accurate.