Hilarius, L., Buscher, U., & Becker, T. (2026). Multi-objective distributed flow shop scheduling with inter-factory transportation and variable production speed. International Journal of Production Research, 1. https://doi.org/10.1080/00207543.2026.2713120
Chicago Style (17th ed.) CitationHilarius, Lydia, Udo Buscher, and Tristan Becker. "Multi-objective Distributed Flow Shop Scheduling with Inter-factory Transportation and Variable Production Speed." International Journal of Production Research 2026: 1. https://doi.org/10.1080/00207543.2026.2713120.
MLA (9th ed.) CitationHilarius, Lydia, et al. "Multi-objective Distributed Flow Shop Scheduling with Inter-factory Transportation and Variable Production Speed." International Journal of Production Research, 2026, p. 1, https://doi.org/10.1080/00207543.2026.2713120.