Considerations Involved in Implementing Material Requirements Planning in a Government Contractor Firm
Saved in:
| Title: | Considerations Involved in Implementing Material Requirements Planning in a Government Contractor Firm |
|---|---|
| Authors: | Biberman, Susan B. |
| Committee Members: | Brooks, George H.; University of Central Florida. College of Engineering [VIAF] University of Central Florida. College of Engineering [LC] |
| Summary: | The government often imposes requirements on their contractors for the purpose of monitoring and control. Many government contractors utilize a matrix organization structure to help cope with the government's ever changing and challenging requirements. It is both the government requirements and this matrix organization which lead to the need for special information and features in a government contractor's manufacturing/material control system. This report specifically addresses those features which would be desirable in a government contractor's MRP system. These features involve the operation of the master schedule, the bill of material, the MRP software, the inventory files, purchasing, and shop floor control. No single government requirement is in direct conflict with the intent of an MRP system. However, the interpretation of these requirements vary within the government agencies and between government contractors. The contractor, the appropriate government agency, and the software vendor, if applicable, need to work together to implement a system which satisfies both internal management needs and government requirements. This report contains features and considerations which should be evaluated when a government contractor is implementing an MRP system. |
| URL: | https://stars.library.ucf.edu/rtd/671 |
| Database: | OpenDissertations |
| FullText | Text: Availability: 0 |
|---|---|
| Header | DbId: ddu DbLabel: OpenDissertations An: ddu.oai.stars.library.ucf.edu.rtd.1670 AccessLevel: 6 PubType: Dissertation/ Thesis PubTypeId: dissertation PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Considerations Involved in Implementing Material Requirements Planning in a Government Contractor Firm – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Biberman%2C+Susan+B%2E%22">Biberman, Susan B.</searchLink> – Name: Author Label: Committee Members Group: Au Data: <searchLink fieldCode="CO" term="%22Brooks%2C+George+H%2E%22">Brooks, George H.</searchLink>; <searchLink fieldCode="CO" term="%22University+of+Central+Florida%2E+College+of+Engineering+[VIAF]+University+of+Central+Florida%2E+College+of+Engineering+[LC]%22">University of Central Florida. College of Engineering [VIAF] University of Central Florida. College of Engineering [LC]</searchLink> – Name: Abstract Label: Summary Group: Ab Data: The government often imposes requirements on their contractors for the purpose of monitoring and control. Many government contractors utilize a matrix organization structure to help cope with the government's ever changing and challenging requirements. It is both the government requirements and this matrix organization which lead to the need for special information and features in a government contractor's manufacturing/material control system. This report specifically addresses those features which would be desirable in a government contractor's MRP system. These features involve the operation of the master schedule, the bill of material, the MRP software, the inventory files, purchasing, and shop floor control. No single government requirement is in direct conflict with the intent of an MRP system. However, the interpretation of these requirements vary within the government agencies and between government contractors. The contractor, the appropriate government agency, and the software vendor, if applicable, need to work together to implement a system which satisfies both internal management needs and government requirements. This report contains features and considerations which should be evaluated when a government contractor is implementing an MRP system. – Name: URL Label: URL Group: URL Data: <link linkTarget="URL" linkTerm="https://stars.library.ucf.edu/rtd/671" linkWindow="_blank">https://stars.library.ucf.edu/rtd/671</link> |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=ddu&AN=ddu.oai.stars.library.ucf.edu.rtd.1670 |
| RecordInfo | BibRecord: BibEntity: Languages: – Code: eng Text: English Subjects: – SubjectFull: Government purchasing Type: general – SubjectFull: Public contracts Type: general – SubjectFull: Master production schedule Type: general – SubjectFull: Bill of materials management Type: general – SubjectFull: MRP software customization Type: general – SubjectFull: Inventory file control Type: general – SubjectFull: Purchasing and shop floor control Type: general – SubjectFull: Engineering Type: general – SubjectFull: Material requirements planning; Government contractors--Management; Manufacturing resource planning--Data processing; Contractors' operations--Planning; Contractors--Government policy Type: general Titles: – TitleFull: Considerations Involved in Implementing Material Requirements Planning in a Government Contractor Firm Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Biberman, Susan B. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 07 Type: published Y: 1983 |
| ResultId | 1 |