Considerations Involved in Implementing Material Requirements Planning in a Government Contractor Firm

Saved in:
Bibliographic Details
Title: Considerations Involved in Implementing Material Requirements Planning in a Government Contractor Firm
Authors: Biberman, Susan B.
Committee Members: Brooks, George H.; University of Central Florida. College of Engineering [VIAF] University of Central Florida. College of Engineering [LC]
Summary: The government often imposes requirements on their contractors for the purpose of monitoring and control. Many government contractors utilize a matrix organization structure to help cope with the government's ever changing and challenging requirements. It is both the government requirements and this matrix organization which lead to the need for special information and features in a government contractor's manufacturing/material control system. This report specifically addresses those features which would be desirable in a government contractor's MRP system. These features involve the operation of the master schedule, the bill of material, the MRP software, the inventory files, purchasing, and shop floor control. No single government requirement is in direct conflict with the intent of an MRP system. However, the interpretation of these requirements vary within the government agencies and between government contractors. The contractor, the appropriate government agency, and the software vendor, if applicable, need to work together to implement a system which satisfies both internal management needs and government requirements. This report contains features and considerations which should be evaluated when a government contractor is implementing an MRP system.
URL: https://stars.library.ucf.edu/rtd/671
Database: OpenDissertations
FullText Text:
  Availability: 0
Header DbId: ddu
DbLabel: OpenDissertations
An: ddu.oai.stars.library.ucf.edu.rtd.1670
AccessLevel: 6
PubType: Dissertation/ Thesis
PubTypeId: dissertation
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Considerations Involved in Implementing Material Requirements Planning in a Government Contractor Firm
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Biberman%2C+Susan+B%2E%22">Biberman, Susan B.</searchLink>
– Name: Author
  Label: Committee Members
  Group: Au
  Data: <searchLink fieldCode="CO" term="%22Brooks%2C+George+H%2E%22">Brooks, George H.</searchLink>; <searchLink fieldCode="CO" term="%22University+of+Central+Florida%2E+College+of+Engineering+[VIAF]+University+of+Central+Florida%2E+College+of+Engineering+[LC]%22">University of Central Florida. College of Engineering [VIAF] University of Central Florida. College of Engineering [LC]</searchLink>
– Name: Abstract
  Label: Summary
  Group: Ab
  Data: The government often imposes requirements on their contractors for the purpose of monitoring and control. Many government contractors utilize a matrix organization structure to help cope with the government's ever changing and challenging requirements. It is both the government requirements and this matrix organization which lead to the need for special information and features in a government contractor's manufacturing/material control system. This report specifically addresses those features which would be desirable in a government contractor's MRP system. These features involve the operation of the master schedule, the bill of material, the MRP software, the inventory files, purchasing, and shop floor control. No single government requirement is in direct conflict with the intent of an MRP system. However, the interpretation of these requirements vary within the government agencies and between government contractors. The contractor, the appropriate government agency, and the software vendor, if applicable, need to work together to implement a system which satisfies both internal management needs and government requirements. This report contains features and considerations which should be evaluated when a government contractor is implementing an MRP system.
– Name: URL
  Label: URL
  Group: URL
  Data: <link linkTarget="URL" linkTerm="https://stars.library.ucf.edu/rtd/671" linkWindow="_blank">https://stars.library.ucf.edu/rtd/671</link>
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=ddu&AN=ddu.oai.stars.library.ucf.edu.rtd.1670
RecordInfo BibRecord:
  BibEntity:
    Languages:
      – Code: eng
        Text: English
    Subjects:
      – SubjectFull: Government purchasing
        Type: general
      – SubjectFull: Public contracts
        Type: general
      – SubjectFull: Master production schedule
        Type: general
      – SubjectFull: Bill of materials management
        Type: general
      – SubjectFull: MRP software customization
        Type: general
      – SubjectFull: Inventory file control
        Type: general
      – SubjectFull: Purchasing and shop floor control
        Type: general
      – SubjectFull: Engineering
        Type: general
      – SubjectFull: Material requirements planning; Government contractors--Management; Manufacturing resource planning--Data processing; Contractors' operations--Planning; Contractors--Government policy
        Type: general
    Titles:
      – TitleFull: Considerations Involved in Implementing Material Requirements Planning in a Government Contractor Firm
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Biberman, Susan B.
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 07
              Type: published
              Y: 1983
ResultId 1