Wikner, J. (2003). Continuous-time dynamic modelling of variable lead times. International Journal of Production Research, 41(12), 2787. https://doi.org/10.1080/0020754031000093178
Chicago Style (17th ed.) CitationWikner, J. "Continuous-time Dynamic Modelling of Variable Lead Times." International Journal of Production Research 41, no. 12 (2003): 2787. https://doi.org/10.1080/0020754031000093178.
MLA (9th ed.) CitationWikner, J. "Continuous-time Dynamic Modelling of Variable Lead Times." International Journal of Production Research, vol. 41, no. 12, 2003, p. 2787, https://doi.org/10.1080/0020754031000093178.
Warning: These citations may not always be 100% accurate.