Placing Winter Concrete: Pearl Harbor Memorial Bridge.

Saved in:
Bibliographic Details
Title: Placing Winter Concrete: Pearl Harbor Memorial Bridge.
Authors: Foley, Tom1 tfoley@walshgroup.com, Schexnayder, Cliff cliff.s@asu.edu
Source: Practice Periodical on Structural Design & Construction. Aug2015, Vol. 20 Issue 3, p1-5. 5p.
Subjects: Bridge design & construction, Concrete construction, Climate change, Product quality, United States economy
Abstract: Placing concrete in cold weather is problematic. The contractors at the Pearl Harbor Memorial Bridge in New Haven, Connecticut, have battled relentless winters to complete the first extradosed bridge in the United States. Their success hinged on detailed winter concreting plans developed to work safely and efficiently during very cold weather. The plans contain multiple concrete mix designs as well as specific heating configurations to keep the various placement areas within acceptable temperature ranges necessary to produce quality concrete. The plans have shown to be effective, allowing placements to occur through a number of snowstorms. [ABSTRACT FROM AUTHOR]
Copyright of Practice Periodical on Structural Design & Construction is the property of American Society of Civil Engineers and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
FullText Text:
  Availability: 0
Header DbId: egs
DbLabel: Engineering Source
An: 108472279
AccessLevel: 6
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Placing Winter Concrete: Pearl Harbor Memorial Bridge.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Foley%2C+Tom%22">Foley, Tom</searchLink><relatesTo>1</relatesTo><i> tfoley@walshgroup.com</i><br /><searchLink fieldCode="AR" term="%22Schexnayder%2C+Cliff%22">Schexnayder, Cliff</searchLink><i> cliff.s@asu.edu</i>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22Practice+Periodical+on+Structural+Design+%26+Construction%22">Practice Periodical on Structural Design & Construction</searchLink>. Aug2015, Vol. 20 Issue 3, p1-5. 5p.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Bridge+design+%26+construction%22">Bridge design & construction</searchLink><br /><searchLink fieldCode="DE" term="%22Concrete+construction%22">Concrete construction</searchLink><br /><searchLink fieldCode="DE" term="%22Climate+change%22">Climate change</searchLink><br /><searchLink fieldCode="DE" term="%22Product+quality%22">Product quality</searchLink><br /><searchLink fieldCode="DE" term="%22United+States+economy%22">United States economy</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: Placing concrete in cold weather is problematic. The contractors at the Pearl Harbor Memorial Bridge in New Haven, Connecticut, have battled relentless winters to complete the first extradosed bridge in the United States. Their success hinged on detailed winter concreting plans developed to work safely and efficiently during very cold weather. The plans contain multiple concrete mix designs as well as specific heating configurations to keep the various placement areas within acceptable temperature ranges necessary to produce quality concrete. The plans have shown to be effective, allowing placements to occur through a number of snowstorms. [ABSTRACT FROM AUTHOR]
– Name: AbstractSuppliedCopyright
  Label:
  Group: Ab
  Data: <i>Copyright of Practice Periodical on Structural Design & Construction is the property of American Society of Civil Engineers and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=108472279
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.1061/(ASCE)SC.1943-5576.0000236
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 5
        StartPage: 1
    Subjects:
      – SubjectFull: Bridge design & construction
        Type: general
      – SubjectFull: Concrete construction
        Type: general
      – SubjectFull: Climate change
        Type: general
      – SubjectFull: Product quality
        Type: general
      – SubjectFull: United States economy
        Type: general
    Titles:
      – TitleFull: Placing Winter Concrete: Pearl Harbor Memorial Bridge.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Foley, Tom
      – PersonEntity:
          Name:
            NameFull: Schexnayder, Cliff
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 08
              Text: Aug2015
              Type: published
              Y: 2015
          Identifiers:
            – Type: issn-print
              Value: 10840680
          Numbering:
            – Type: volume
              Value: 20
            – Type: issue
              Value: 3
          Titles:
            – TitleFull: Practice Periodical on Structural Design & Construction
              Type: main
ResultId 1