Placing Winter Concrete: Pearl Harbor Memorial Bridge.
Saved in:
| Title: | Placing Winter Concrete: Pearl Harbor Memorial Bridge. |
|---|---|
| Authors: | Foley, Tom1 tfoley@walshgroup.com, Schexnayder, Cliff cliff.s@asu.edu |
| Source: | Practice Periodical on Structural Design & Construction. Aug2015, Vol. 20 Issue 3, p1-5. 5p. |
| Subjects: | Bridge design & construction, Concrete construction, Climate change, Product quality, United States economy |
| Abstract: | Placing concrete in cold weather is problematic. The contractors at the Pearl Harbor Memorial Bridge in New Haven, Connecticut, have battled relentless winters to complete the first extradosed bridge in the United States. Their success hinged on detailed winter concreting plans developed to work safely and efficiently during very cold weather. The plans contain multiple concrete mix designs as well as specific heating configurations to keep the various placement areas within acceptable temperature ranges necessary to produce quality concrete. The plans have shown to be effective, allowing placements to occur through a number of snowstorms. [ABSTRACT FROM AUTHOR] |
| Copyright of Practice Periodical on Structural Design & Construction is the property of American Society of Civil Engineers and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Engineering Source |
| FullText | Text: Availability: 0 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 108472279 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Placing Winter Concrete: Pearl Harbor Memorial Bridge. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Foley%2C+Tom%22">Foley, Tom</searchLink><relatesTo>1</relatesTo><i> tfoley@walshgroup.com</i><br /><searchLink fieldCode="AR" term="%22Schexnayder%2C+Cliff%22">Schexnayder, Cliff</searchLink><i> cliff.s@asu.edu</i> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Practice+Periodical+on+Structural+Design+%26+Construction%22">Practice Periodical on Structural Design & Construction</searchLink>. Aug2015, Vol. 20 Issue 3, p1-5. 5p. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22Bridge+design+%26+construction%22">Bridge design & construction</searchLink><br /><searchLink fieldCode="DE" term="%22Concrete+construction%22">Concrete construction</searchLink><br /><searchLink fieldCode="DE" term="%22Climate+change%22">Climate change</searchLink><br /><searchLink fieldCode="DE" term="%22Product+quality%22">Product quality</searchLink><br /><searchLink fieldCode="DE" term="%22United+States+economy%22">United States economy</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: Placing concrete in cold weather is problematic. The contractors at the Pearl Harbor Memorial Bridge in New Haven, Connecticut, have battled relentless winters to complete the first extradosed bridge in the United States. Their success hinged on detailed winter concreting plans developed to work safely and efficiently during very cold weather. The plans contain multiple concrete mix designs as well as specific heating configurations to keep the various placement areas within acceptable temperature ranges necessary to produce quality concrete. The plans have shown to be effective, allowing placements to occur through a number of snowstorms. [ABSTRACT FROM AUTHOR] – Name: AbstractSuppliedCopyright Label: Group: Ab Data: <i>Copyright of Practice Periodical on Structural Design & Construction is the property of American Society of Civil Engineers and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=108472279 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.1061/(ASCE)SC.1943-5576.0000236 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 5 StartPage: 1 Subjects: – SubjectFull: Bridge design & construction Type: general – SubjectFull: Concrete construction Type: general – SubjectFull: Climate change Type: general – SubjectFull: Product quality Type: general – SubjectFull: United States economy Type: general Titles: – TitleFull: Placing Winter Concrete: Pearl Harbor Memorial Bridge. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Foley, Tom – PersonEntity: Name: NameFull: Schexnayder, Cliff IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 08 Text: Aug2015 Type: published Y: 2015 Identifiers: – Type: issn-print Value: 10840680 Numbering: – Type: volume Value: 20 – Type: issue Value: 3 Titles: – TitleFull: Practice Periodical on Structural Design & Construction Type: main |
| ResultId | 1 |