APA (7th ed.) Citation

Hossain, M. S. J., & Sarker, B. R. (2016). Optimal locations of on-line and off-line rework stations in a serial production system. International Journal of Production Research, 54(12), 3603. https://doi.org/10.1080/00207543.2015.1117676

Chicago Style (17th ed.) Citation

Hossain, Md. Shahriar J., and Bhaba R. Sarker. "Optimal Locations of On-line and Off-line Rework Stations in a Serial Production System." International Journal of Production Research 54, no. 12 (2016): 3603. https://doi.org/10.1080/00207543.2015.1117676.

MLA (9th ed.) Citation

Hossain, Md. Shahriar J., and Bhaba R. Sarker. "Optimal Locations of On-line and Off-line Rework Stations in a Serial Production System." International Journal of Production Research, vol. 54, no. 12, 2016, p. 3603, https://doi.org/10.1080/00207543.2015.1117676.

Warning: These citations may not always be 100% accurate.