Identification of potential improvement areas in industrial housing: A case study of waste.

Saved in:
Bibliographic Details
Title: Identification of potential improvement areas in industrial housing: A case study of waste.
Authors: Gustafsson, Åsa1 asa.gustafsson@lnu.se, Vessby, Johan1 johan.vessby@lnu.se, Rask, Lars-Olof1 lars-olof.rask@lnu.se
Source: Lean Construction Journal. 2012, p61-77. 17p. 4 Color Photographs, 4 Diagrams, 1 Chart, 3 Graphs.
Subjects: Industrial housing, Waste disposal in construction industry, Supply chains, Value stream mapping, Wooden building, Logistics
Abstract: Purpose: The purpose of this paper is to categorize waste in the construction industry for a specific building system (using wood as the load-bearing elements). Research method: This case study consists of the following three parts: 1) current state maps of the supply chain; 2) identification of waste appearing at the construction site; and 3) a time study of the installation process. Findings: This paper proposes that waste in the construction supply chain for the current case can be categorized as follows: Defects and Controls, Logistics, Utilization of Resources, Health and Safety, and System and Structure. Limitations: The current paper is based on a single case study; and hence, its results need to be replicated in further studies. Implications: This study contributes to previous knowledge with regards to lean construction and waste (as it specifies the waste concept with regard to the construction industry). Value for practitioners: This paper provides a categorization of waste in the construction industry in which the categories are inherent from the same source. Hence, elimination of the waste is facilitated by identifying an overall solution for each category rather than for individual types of waste. [ABSTRACT FROM AUTHOR]
Copyright of Lean Construction Journal is the property of Lean Construction Institute and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
Be the first to leave a comment!
You must be logged in first