A computational study of branch and bound techniques for minimizing the total weighted tardiness in job shops.

Saved in:
Bibliographic Details
Title: A computational study of branch and bound techniques for minimizing the total weighted tardiness in job shops.
Authors: Singer, Marcos1, Pinedo, Michael2
Source: IIE Transactions. Feb98, Vol. 30 Issue 2, p109-118. 10p.
Subjects: Tardiness, Job shops, Production scheduling, Industrial engineering, Industrial management, Comparative studies
Abstract: We present and compare a number of branch and bound algorithms for minimizing the total weighted tardiness in job shops. There arc basically two types of branching schemes. The first one inserts operations in a partial schedule, while the second one fixes arcs in the disjunctive graph formulation of the problem. The bounding schemes are based on the analysis of precedence constraints, and on the solution of nonpreemptive single machine subproblems that are subject to so-called delayed precedence constraints. We obtain optimal solutions for all the instances with ten jobs and ten machines that we consider, including three tardiness versions of a well-known 10 x 10 instance introduced by Muth and Thompson [1] in 1963. [ABSTRACT FROM AUTHOR]
Copyright of IIE Transactions is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
Description
Abstract:We present and compare a number of branch and bound algorithms for minimizing the total weighted tardiness in job shops. There arc basically two types of branching schemes. The first one inserts operations in a partial schedule, while the second one fixes arcs in the disjunctive graph formulation of the problem. The bounding schemes are based on the analysis of precedence constraints, and on the solution of nonpreemptive single machine subproblems that are subject to so-called delayed precedence constraints. We obtain optimal solutions for all the instances with ten jobs and ten machines that we consider, including three tardiness versions of a well-known 10 x 10 instance introduced by Muth and Thompson [1] in 1963. [ABSTRACT FROM AUTHOR]
ISSN:0740817X
DOI:10.1023/A:1007405915227