Creating a Contract for Success.
Saved in:
| Title: | Creating a Contract for Success. |
|---|---|
| Authors: | PIERCE, ADAM1 |
| Source: | ASHRAE Journal. May2017, Vol. 59 Issue 5, p46-56. 6p. |
| Subjects: | Heating & ventilation of school buildings, Energy consumption, Heating & ventilation industry, Debt service, School districts |
| Abstract: | A Kentucky school plagued with severe operational and indoor environmental issues paid hundreds of thousands of dollars in O&M expenses over 10 years for temporary solutions. The even bigger problem? The school district didn't have the available capital funding to replace the HVAC system. Traditional funding revenues were already committed to other school facility debt. So, the school district entered into a guaranteed energy savings contract to fund the new system. Money saved from reduced energy and O&M is reallocated to cover the debt service. [ABSTRACT FROM AUTHOR] |
| Copyright of ASHRAE Journal is the property of ASHRAE and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Engineering Source |
| FullText | Links: – Type: pdflink Text: Availability: 0 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 122839545 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Creating a Contract for Success. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22PIERCE%2C+ADAM%22">PIERCE, ADAM</searchLink><relatesTo>1</relatesTo> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22ASHRAE+Journal%22">ASHRAE Journal</searchLink>. May2017, Vol. 59 Issue 5, p46-56. 6p. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22Heating+%26+ventilation+of+school+buildings%22">Heating & ventilation of school buildings</searchLink><br /><searchLink fieldCode="DE" term="%22Energy+consumption%22">Energy consumption</searchLink><br /><searchLink fieldCode="DE" term="%22Heating+%26+ventilation+industry%22">Heating & ventilation industry</searchLink><br /><searchLink fieldCode="DE" term="%22Debt+service%22">Debt service</searchLink><br /><searchLink fieldCode="DE" term="%22School+districts%22">School districts</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: A Kentucky school plagued with severe operational and indoor environmental issues paid hundreds of thousands of dollars in O&M expenses over 10 years for temporary solutions. The even bigger problem? The school district didn't have the available capital funding to replace the HVAC system. Traditional funding revenues were already committed to other school facility debt. So, the school district entered into a guaranteed energy savings contract to fund the new system. Money saved from reduced energy and O&M is reallocated to cover the debt service. [ABSTRACT FROM AUTHOR] – Name: AbstractSuppliedCopyright Label: Group: Ab Data: <i>Copyright of ASHRAE Journal is the property of ASHRAE and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=122839545 |
| RecordInfo | BibRecord: BibEntity: Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 6 StartPage: 46 Subjects: – SubjectFull: Heating & ventilation of school buildings Type: general – SubjectFull: Energy consumption Type: general – SubjectFull: Heating & ventilation industry Type: general – SubjectFull: Debt service Type: general – SubjectFull: School districts Type: general Titles: – TitleFull: Creating a Contract for Success. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: PIERCE, ADAM IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 05 Text: May2017 Type: published Y: 2017 Identifiers: – Type: issn-print Value: 00012491 Numbering: – Type: volume Value: 59 – Type: issue Value: 5 Titles: – TitleFull: ASHRAE Journal Type: main |
| ResultId | 1 |