Matos, M., Sperling, M. v., Matos, A., Miranda, S., Souza, T., & Costa, L. (2017). Key factors in the clogging process of horizontal subsurface flow constructed wetlands receiving anaerobically treated sewage. Ecological Engineering, 106, 588. https://doi.org/10.1016/j.ecoleng.2017.06.013
Chicago Style (17th ed.) CitationMatos, M.P, M. von Sperling, A.T Matos, S.T Miranda, T.D Souza, and L.M Costa. "Key Factors in the Clogging Process of Horizontal Subsurface Flow Constructed Wetlands Receiving Anaerobically Treated Sewage." Ecological Engineering 106 (2017): 588. https://doi.org/10.1016/j.ecoleng.2017.06.013.
MLA (9th ed.) CitationMatos, M.P, et al. "Key Factors in the Clogging Process of Horizontal Subsurface Flow Constructed Wetlands Receiving Anaerobically Treated Sewage." Ecological Engineering, vol. 106, 2017, p. 588, https://doi.org/10.1016/j.ecoleng.2017.06.013.