Liang, G., Hu, Y., & Li, Q. (2018). Safety Monitoring of High Arch Dams in Initial Operation Period Using Vector Error Correction Model. Rock Mechanics & Rock Engineering, 51(8), 2469. https://doi.org/10.1007/s00603-017-1287-y
Chicago Style (17th ed.) CitationLiang, Guohe, Yu Hu, and Qingbin Li. "Safety Monitoring of High Arch Dams in Initial Operation Period Using Vector Error Correction Model." Rock Mechanics & Rock Engineering 51, no. 8 (2018): 2469. https://doi.org/10.1007/s00603-017-1287-y.
MLA (9th ed.) CitationLiang, Guohe, et al. "Safety Monitoring of High Arch Dams in Initial Operation Period Using Vector Error Correction Model." Rock Mechanics & Rock Engineering, vol. 51, no. 8, 2018, p. 2469, https://doi.org/10.1007/s00603-017-1287-y.