Commissioning of the first WEST load-resilient long pulse ICRF launcher in the TITAN testbed and on WEST plasmas.

Saved in:
Bibliographic Details
Title: Commissioning of the first WEST load-resilient long pulse ICRF launcher in the TITAN testbed and on WEST plasmas.
Authors: Bernard, Jean-Michel1 (AUTHOR) jean-michel-2.bernard@cea.fr, Helou, Walid1 (AUTHOR), Mollard, Patrick1 (AUTHOR), Delaplanche, Jean-Marc1 (AUTHOR), Delmas, Etienne1 (AUTHOR), Durodié, Frédéric2 (AUTHOR), Ferlay, Fabien1 (AUTHOR), Hatchressian, Jean-Claude1 (AUTHOR), Hillairet, Julien1 (AUTHOR), Lombard, Gilles1 (AUTHOR), Samaille, Franck1 (AUTHOR), Song, Yuntao3 (AUTHOR), Verger, Jean-Marc1 (AUTHOR), Yang, Qingxi3 (AUTHOR), Wang, Yong Shen3 (AUTHOR)
Source: Fusion Engineering & Design. Sep2019:Part B, Vol. 146, p1778-1781. 4p.
Subjects: Impedance matching, High voltages
Abstract: Before the installation of the first ICRF launcher in WEST, dedicated RF, cold and hot leak tests have been performed in the TITAN test bed [ 1 , 2 ] (Bernard et al., 2011a,b). All the water circuits have been controlled in order to avoid any in-vessel leak. The impedance matching has been checked at low level (mW range) and the high RF voltage standoff has been validated at the nominal value of 27 kV peak. During the WEST C3a campaign, the commissioning of the first antenna has been successfully performed. About 0.6 MW of power has been coupled to the plasma, and the launcher's load-resilience has been proved. [ABSTRACT FROM AUTHOR]
Copyright of Fusion Engineering & Design is the property of Elsevier B.V. and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
Description
Abstract:Before the installation of the first ICRF launcher in WEST, dedicated RF, cold and hot leak tests have been performed in the TITAN test bed [ 1 , 2 ] (Bernard et al., 2011a,b). All the water circuits have been controlled in order to avoid any in-vessel leak. The impedance matching has been checked at low level (mW range) and the high RF voltage standoff has been validated at the nominal value of 27 kV peak. During the WEST C3a campaign, the commissioning of the first antenna has been successfully performed. About 0.6 MW of power has been coupled to the plasma, and the launcher's load-resilience has been proved. [ABSTRACT FROM AUTHOR]
ISSN:09203796
DOI:10.1016/j.fusengdes.2019.03.033