Commissioning of the first WEST load-resilient long pulse ICRF launcher in the TITAN testbed and on WEST plasmas.
Saved in:
| Title: | Commissioning of the first WEST load-resilient long pulse ICRF launcher in the TITAN testbed and on WEST plasmas. |
|---|---|
| Authors: | Bernard, Jean-Michel1 (AUTHOR) jean-michel-2.bernard@cea.fr, Helou, Walid1 (AUTHOR), Mollard, Patrick1 (AUTHOR), Delaplanche, Jean-Marc1 (AUTHOR), Delmas, Etienne1 (AUTHOR), Durodié, Frédéric2 (AUTHOR), Ferlay, Fabien1 (AUTHOR), Hatchressian, Jean-Claude1 (AUTHOR), Hillairet, Julien1 (AUTHOR), Lombard, Gilles1 (AUTHOR), Samaille, Franck1 (AUTHOR), Song, Yuntao3 (AUTHOR), Verger, Jean-Marc1 (AUTHOR), Yang, Qingxi3 (AUTHOR), Wang, Yong Shen3 (AUTHOR) |
| Source: | Fusion Engineering & Design. Sep2019:Part B, Vol. 146, p1778-1781. 4p. |
| Subjects: | Impedance matching, High voltages |
| Abstract: | Before the installation of the first ICRF launcher in WEST, dedicated RF, cold and hot leak tests have been performed in the TITAN test bed [ 1 , 2 ] (Bernard et al., 2011a,b). All the water circuits have been controlled in order to avoid any in-vessel leak. The impedance matching has been checked at low level (mW range) and the high RF voltage standoff has been validated at the nominal value of 27 kV peak. During the WEST C3a campaign, the commissioning of the first antenna has been successfully performed. About 0.6 MW of power has been coupled to the plasma, and the launcher's load-resilience has been proved. [ABSTRACT FROM AUTHOR] |
| Copyright of Fusion Engineering & Design is the property of Elsevier B.V. and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Engineering Source |
| FullText | Text: Availability: 0 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 138692774 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Commissioning of the first WEST load-resilient long pulse ICRF launcher in the TITAN testbed and on WEST plasmas. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Bernard%2C+Jean-Michel%22">Bernard, Jean-Michel</searchLink><relatesTo>1</relatesTo> (AUTHOR)<i> jean-michel-2.bernard@cea.fr</i><br /><searchLink fieldCode="AR" term="%22Helou%2C+Walid%22">Helou, Walid</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Mollard%2C+Patrick%22">Mollard, Patrick</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Delaplanche%2C+Jean-Marc%22">Delaplanche, Jean-Marc</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Delmas%2C+Etienne%22">Delmas, Etienne</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Durodié%2C+Frédéric%22">Durodié, Frédéric</searchLink><relatesTo>2</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Ferlay%2C+Fabien%22">Ferlay, Fabien</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Hatchressian%2C+Jean-Claude%22">Hatchressian, Jean-Claude</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Hillairet%2C+Julien%22">Hillairet, Julien</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Lombard%2C+Gilles%22">Lombard, Gilles</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Samaille%2C+Franck%22">Samaille, Franck</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Song%2C+Yuntao%22">Song, Yuntao</searchLink><relatesTo>3</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Verger%2C+Jean-Marc%22">Verger, Jean-Marc</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Yang%2C+Qingxi%22">Yang, Qingxi</searchLink><relatesTo>3</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Wang%2C+Yong+Shen%22">Wang, Yong Shen</searchLink><relatesTo>3</relatesTo> (AUTHOR) – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Fusion+Engineering+%26+Design%22">Fusion Engineering & Design</searchLink>. Sep2019:Part B, Vol. 146, p1778-1781. 4p. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22Impedance+matching%22">Impedance matching</searchLink><br /><searchLink fieldCode="DE" term="%22High+voltages%22">High voltages</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: Before the installation of the first ICRF launcher in WEST, dedicated RF, cold and hot leak tests have been performed in the TITAN test bed [ 1 , 2 ] (Bernard et al., 2011a,b). All the water circuits have been controlled in order to avoid any in-vessel leak. The impedance matching has been checked at low level (mW range) and the high RF voltage standoff has been validated at the nominal value of 27 kV peak. During the WEST C3a campaign, the commissioning of the first antenna has been successfully performed. About 0.6 MW of power has been coupled to the plasma, and the launcher's load-resilience has been proved. [ABSTRACT FROM AUTHOR] – Name: AbstractSuppliedCopyright Label: Group: Ab Data: <i>Copyright of Fusion Engineering & Design is the property of Elsevier B.V. and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=138692774 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.1016/j.fusengdes.2019.03.033 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 4 StartPage: 1778 Subjects: – SubjectFull: Impedance matching Type: general – SubjectFull: High voltages Type: general Titles: – TitleFull: Commissioning of the first WEST load-resilient long pulse ICRF launcher in the TITAN testbed and on WEST plasmas. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Bernard, Jean-Michel – PersonEntity: Name: NameFull: Helou, Walid – PersonEntity: Name: NameFull: Mollard, Patrick – PersonEntity: Name: NameFull: Delaplanche, Jean-Marc – PersonEntity: Name: NameFull: Delmas, Etienne – PersonEntity: Name: NameFull: Durodié, Frédéric – PersonEntity: Name: NameFull: Ferlay, Fabien – PersonEntity: Name: NameFull: Hatchressian, Jean-Claude – PersonEntity: Name: NameFull: Hillairet, Julien – PersonEntity: Name: NameFull: Lombard, Gilles – PersonEntity: Name: NameFull: Samaille, Franck – PersonEntity: Name: NameFull: Song, Yuntao – PersonEntity: Name: NameFull: Verger, Jean-Marc – PersonEntity: Name: NameFull: Yang, Qingxi – PersonEntity: Name: NameFull: Wang, Yong Shen IsPartOfRelationships: – BibEntity: Dates: – D: 02 M: 09 Text: Sep2019:Part B Type: published Y: 2019 Identifiers: – Type: issn-print Value: 09203796 Numbering: – Type: volume Value: 146 Titles: – TitleFull: Fusion Engineering & Design Type: main |
| ResultId | 1 |