Project Performance Evaluation using EVA Technique: Kotay Bridge Construction Project on Kayto River in Afghanistan.

Saved in:
Bibliographic Details
Title: Project Performance Evaluation using EVA Technique: Kotay Bridge Construction Project on Kayto River in Afghanistan.
Authors: UGURAL, Mehmet Nurettin1 m.ugural@iku.edu.tr, BURGAN, Halil Ibrahim2 burgan@akdeniz.edu.tr
Source: Technical Gazette / Tehnički Vjesnik. 2021, Vol. 28 Issue 1, p340-345. 6p.
Subjects: Bridge design & construction, Construction projects, Project evaluation, Cost overruns, Military hospitals
Geographic Terms: Afghanistan
Abstract: The objective of the study is the assessment of an operating bridge project in terms of its performance by the evaluate project performance (EVA) technique. To apply the EVA technique, cost and schedule baselines and an update record of performed work with spent money is prepared for the project. The data is taken directly from site office of the project. Kotay bridge construction project is selected for case study. Project tracking is achieved by taking EVA technique to assess the Kotay bridge construction project performance in the last five months, and to find out the cost and time overruns if they exist. The Estimation at Completion (EAC) and To-Complete Performance Index (TCPI) are found as well to know how efficiently are used the remaining financial resources. The study revealed that CPI and SPI are both less than 1.0, which means that the project could not be performed well. Cost & time overruns are clearly indicated as well. [ABSTRACT FROM AUTHOR]
Copyright of Technical Gazette / Tehnički Vjesnik is the property of Tehnicki Vjesnik and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
FullText Links:
  – Type: pdflink
Text:
  Availability: 0
Header DbId: egs
DbLabel: Engineering Source
An: 149032380
AccessLevel: 6
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Project Performance Evaluation using EVA Technique: Kotay Bridge Construction Project on Kayto River in Afghanistan.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22UGURAL%2C+Mehmet+Nurettin%22">UGURAL, Mehmet Nurettin</searchLink><relatesTo>1</relatesTo><i> m.ugural@iku.edu.tr</i><br /><searchLink fieldCode="AR" term="%22BURGAN%2C+Halil+Ibrahim%22">BURGAN, Halil Ibrahim</searchLink><relatesTo>2</relatesTo><i> burgan@akdeniz.edu.tr</i>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22Technical+Gazette+%2F+Tehnički+Vjesnik%22">Technical Gazette / Tehnički Vjesnik</searchLink>. 2021, Vol. 28 Issue 1, p340-345. 6p.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Bridge+design+%26+construction%22">Bridge design & construction</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+projects%22">Construction projects</searchLink><br /><searchLink fieldCode="DE" term="%22Project+evaluation%22">Project evaluation</searchLink><br /><searchLink fieldCode="DE" term="%22Cost+overruns%22">Cost overruns</searchLink><br /><searchLink fieldCode="DE" term="%22Military+hospitals%22">Military hospitals</searchLink>
– Name: SubjectGeographic
  Label: Geographic Terms
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Afghanistan%22">Afghanistan</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: The objective of the study is the assessment of an operating bridge project in terms of its performance by the evaluate project performance (EVA) technique. To apply the EVA technique, cost and schedule baselines and an update record of performed work with spent money is prepared for the project. The data is taken directly from site office of the project. Kotay bridge construction project is selected for case study. Project tracking is achieved by taking EVA technique to assess the Kotay bridge construction project performance in the last five months, and to find out the cost and time overruns if they exist. The Estimation at Completion (EAC) and To-Complete Performance Index (TCPI) are found as well to know how efficiently are used the remaining financial resources. The study revealed that CPI and SPI are both less than 1.0, which means that the project could not be performed well. Cost & time overruns are clearly indicated as well. [ABSTRACT FROM AUTHOR]
– Name: AbstractSuppliedCopyright
  Label:
  Group: Ab
  Data: <i>Copyright of Technical Gazette / Tehnički Vjesnik is the property of Tehnicki Vjesnik and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=149032380
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.17559/TV-20200114133619
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 6
        StartPage: 340
    Subjects:
      – SubjectFull: Bridge design & construction
        Type: general
      – SubjectFull: Construction projects
        Type: general
      – SubjectFull: Project evaluation
        Type: general
      – SubjectFull: Cost overruns
        Type: general
      – SubjectFull: Military hospitals
        Type: general
      – SubjectFull: Afghanistan
        Type: general
    Titles:
      – TitleFull: Project Performance Evaluation using EVA Technique: Kotay Bridge Construction Project on Kayto River in Afghanistan.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: UGURAL, Mehmet Nurettin
      – PersonEntity:
          Name:
            NameFull: BURGAN, Halil Ibrahim
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 01
              Text: 2021
              Type: published
              Y: 2021
          Identifiers:
            – Type: issn-print
              Value: 13303651
          Numbering:
            – Type: volume
              Value: 28
            – Type: issue
              Value: 1
          Titles:
            – TitleFull: Technical Gazette / Tehnički Vjesnik
              Type: main
ResultId 1