Risks affecting the performance of Ethiopian domestic road construction contractors.
Saved in:
| Title: | Risks affecting the performance of Ethiopian domestic road construction contractors. |
|---|---|
| Authors: | Wubet, Worku Asratie1 (AUTHOR), Burrow, Michael1 (AUTHOR), Ghataora, Gurmel1 (AUTHOR) |
| Source: | International Journal of Construction Management. Mar2023, Vol. 23 Issue 4, p639-647. 9p. |
| Subjects: | Construction contractors, Road construction, National currencies, Ethiopians, Construction projects |
| Geographic Terms: | Ethiopia |
| Abstract: | The government of Ethiopia (GOE) has been working to enhance the capacity of Ethiopian domestic contractors (EDCs) over the past three decades. This has enabled the development of several private and public construction firms. However, the performance of EDCs is still a matter of concern. The aim of this paper is, therefore, to identify and prioritize risks of EDCs operating in the federal road construction projects. Forty-seven risk events were identified through an in-depth literature review. A questionnaire survey was conducted with professionals from the three main contracting parties (contractors, consultants, and the client) to prioritize the identified risk events in terms of their relative significance. The study outlined the ten most significant risk events namely, shortage of cash, inadequate planning, lack of access to foreign currency, delay in possession of site, frequent breakdown of equipment, delay in delivery of material and equipment, financial failure, inflation, delay in payments and poor commitment and coordination within the contractors' team. This study provides an insight into contractors' risks with a focus on domestic contractors engaged in the road sector. The findings of this study will be helpful to construction firms to develop an appropriate risk management system to effectively mitigate their risks. [ABSTRACT FROM AUTHOR] |
| Copyright of International Journal of Construction Management is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Engineering Source |
| FullText | Text: Availability: 0 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 162418573 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Risks affecting the performance of Ethiopian domestic road construction contractors. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Wubet%2C+Worku+Asratie%22">Wubet, Worku Asratie</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Burrow%2C+Michael%22">Burrow, Michael</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Ghataora%2C+Gurmel%22">Ghataora, Gurmel</searchLink><relatesTo>1</relatesTo> (AUTHOR) – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22International+Journal+of+Construction+Management%22">International Journal of Construction Management</searchLink>. Mar2023, Vol. 23 Issue 4, p639-647. 9p. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22Construction+contractors%22">Construction contractors</searchLink><br /><searchLink fieldCode="DE" term="%22Road+construction%22">Road construction</searchLink><br /><searchLink fieldCode="DE" term="%22National+currencies%22">National currencies</searchLink><br /><searchLink fieldCode="DE" term="%22Ethiopians%22">Ethiopians</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+projects%22">Construction projects</searchLink> – Name: SubjectGeographic Label: Geographic Terms Group: Su Data: <searchLink fieldCode="DE" term="%22Ethiopia%22">Ethiopia</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: The government of Ethiopia (GOE) has been working to enhance the capacity of Ethiopian domestic contractors (EDCs) over the past three decades. This has enabled the development of several private and public construction firms. However, the performance of EDCs is still a matter of concern. The aim of this paper is, therefore, to identify and prioritize risks of EDCs operating in the federal road construction projects. Forty-seven risk events were identified through an in-depth literature review. A questionnaire survey was conducted with professionals from the three main contracting parties (contractors, consultants, and the client) to prioritize the identified risk events in terms of their relative significance. The study outlined the ten most significant risk events namely, shortage of cash, inadequate planning, lack of access to foreign currency, delay in possession of site, frequent breakdown of equipment, delay in delivery of material and equipment, financial failure, inflation, delay in payments and poor commitment and coordination within the contractors' team. This study provides an insight into contractors' risks with a focus on domestic contractors engaged in the road sector. The findings of this study will be helpful to construction firms to develop an appropriate risk management system to effectively mitigate their risks. [ABSTRACT FROM AUTHOR] – Name: AbstractSuppliedCopyright Label: Group: Ab Data: <i>Copyright of International Journal of Construction Management is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=162418573 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.1080/15623599.2021.1902732 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 9 StartPage: 639 Subjects: – SubjectFull: Construction contractors Type: general – SubjectFull: Road construction Type: general – SubjectFull: National currencies Type: general – SubjectFull: Ethiopians Type: general – SubjectFull: Construction projects Type: general – SubjectFull: Ethiopia Type: general Titles: – TitleFull: Risks affecting the performance of Ethiopian domestic road construction contractors. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Wubet, Worku Asratie – PersonEntity: Name: NameFull: Burrow, Michael – PersonEntity: Name: NameFull: Ghataora, Gurmel IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 03 Text: Mar2023 Type: published Y: 2023 Identifiers: – Type: issn-print Value: 15623599 Numbering: – Type: volume Value: 23 – Type: issue Value: 4 Titles: – TitleFull: International Journal of Construction Management Type: main |
| ResultId | 1 |