Risks affecting the performance of Ethiopian domestic road construction contractors.

Saved in:
Bibliographic Details
Title: Risks affecting the performance of Ethiopian domestic road construction contractors.
Authors: Wubet, Worku Asratie1 (AUTHOR), Burrow, Michael1 (AUTHOR), Ghataora, Gurmel1 (AUTHOR)
Source: International Journal of Construction Management. Mar2023, Vol. 23 Issue 4, p639-647. 9p.
Subjects: Construction contractors, Road construction, National currencies, Ethiopians, Construction projects
Geographic Terms: Ethiopia
Abstract: The government of Ethiopia (GOE) has been working to enhance the capacity of Ethiopian domestic contractors (EDCs) over the past three decades. This has enabled the development of several private and public construction firms. However, the performance of EDCs is still a matter of concern. The aim of this paper is, therefore, to identify and prioritize risks of EDCs operating in the federal road construction projects. Forty-seven risk events were identified through an in-depth literature review. A questionnaire survey was conducted with professionals from the three main contracting parties (contractors, consultants, and the client) to prioritize the identified risk events in terms of their relative significance. The study outlined the ten most significant risk events namely, shortage of cash, inadequate planning, lack of access to foreign currency, delay in possession of site, frequent breakdown of equipment, delay in delivery of material and equipment, financial failure, inflation, delay in payments and poor commitment and coordination within the contractors' team. This study provides an insight into contractors' risks with a focus on domestic contractors engaged in the road sector. The findings of this study will be helpful to construction firms to develop an appropriate risk management system to effectively mitigate their risks. [ABSTRACT FROM AUTHOR]
Copyright of International Journal of Construction Management is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Database: Engineering Source
FullText Text:
  Availability: 0
Header DbId: egs
DbLabel: Engineering Source
An: 162418573
AccessLevel: 6
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Risks affecting the performance of Ethiopian domestic road construction contractors.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Wubet%2C+Worku+Asratie%22">Wubet, Worku Asratie</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Burrow%2C+Michael%22">Burrow, Michael</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Ghataora%2C+Gurmel%22">Ghataora, Gurmel</searchLink><relatesTo>1</relatesTo> (AUTHOR)
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22International+Journal+of+Construction+Management%22">International Journal of Construction Management</searchLink>. Mar2023, Vol. 23 Issue 4, p639-647. 9p.
– Name: Subject
  Label: Subjects
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Construction+contractors%22">Construction contractors</searchLink><br /><searchLink fieldCode="DE" term="%22Road+construction%22">Road construction</searchLink><br /><searchLink fieldCode="DE" term="%22National+currencies%22">National currencies</searchLink><br /><searchLink fieldCode="DE" term="%22Ethiopians%22">Ethiopians</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+projects%22">Construction projects</searchLink>
– Name: SubjectGeographic
  Label: Geographic Terms
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Ethiopia%22">Ethiopia</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: The government of Ethiopia (GOE) has been working to enhance the capacity of Ethiopian domestic contractors (EDCs) over the past three decades. This has enabled the development of several private and public construction firms. However, the performance of EDCs is still a matter of concern. The aim of this paper is, therefore, to identify and prioritize risks of EDCs operating in the federal road construction projects. Forty-seven risk events were identified through an in-depth literature review. A questionnaire survey was conducted with professionals from the three main contracting parties (contractors, consultants, and the client) to prioritize the identified risk events in terms of their relative significance. The study outlined the ten most significant risk events namely, shortage of cash, inadequate planning, lack of access to foreign currency, delay in possession of site, frequent breakdown of equipment, delay in delivery of material and equipment, financial failure, inflation, delay in payments and poor commitment and coordination within the contractors' team. This study provides an insight into contractors' risks with a focus on domestic contractors engaged in the road sector. The findings of this study will be helpful to construction firms to develop an appropriate risk management system to effectively mitigate their risks. [ABSTRACT FROM AUTHOR]
– Name: AbstractSuppliedCopyright
  Label:
  Group: Ab
  Data: <i>Copyright of International Journal of Construction Management is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=162418573
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.1080/15623599.2021.1902732
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 9
        StartPage: 639
    Subjects:
      – SubjectFull: Construction contractors
        Type: general
      – SubjectFull: Road construction
        Type: general
      – SubjectFull: National currencies
        Type: general
      – SubjectFull: Ethiopians
        Type: general
      – SubjectFull: Construction projects
        Type: general
      – SubjectFull: Ethiopia
        Type: general
    Titles:
      – TitleFull: Risks affecting the performance of Ethiopian domestic road construction contractors.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Wubet, Worku Asratie
      – PersonEntity:
          Name:
            NameFull: Burrow, Michael
      – PersonEntity:
          Name:
            NameFull: Ghataora, Gurmel
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 03
              Text: Mar2023
              Type: published
              Y: 2023
          Identifiers:
            – Type: issn-print
              Value: 15623599
          Numbering:
            – Type: volume
              Value: 23
            – Type: issue
              Value: 4
          Titles:
            – TitleFull: International Journal of Construction Management
              Type: main
ResultId 1