APA (7th ed.) Citation

Feng, X., & Peng, H. (2024). Robust identical parallel machine scheduling with two-stage time-of-use tariff and not-all-machine option. International Journal of Production Research, 62(1/2), 380. https://doi.org/10.1080/00207543.2023.2228922

Chicago Style (17th ed.) Citation

Feng, Xin, and Hongjun Peng. "Robust Identical Parallel Machine Scheduling with Two-stage Time-of-use Tariff and Not-all-machine Option." International Journal of Production Research 62, no. 1/2 (2024): 380. https://doi.org/10.1080/00207543.2023.2228922.

MLA (9th ed.) Citation

Feng, Xin, and Hongjun Peng. "Robust Identical Parallel Machine Scheduling with Two-stage Time-of-use Tariff and Not-all-machine Option." International Journal of Production Research, vol. 62, no. 1/2, 2024, p. 380, https://doi.org/10.1080/00207543.2023.2228922.

Warning: These citations may not always be 100% accurate.